Mount Washington Cog Railway - Structural Engineer of Record for the new Ammonoosuc River Bridge for the Cog Railway on Mount Washington. The existing trestle washed out in the October 2017 floods. The permitting, design and construction of the bridge was completed by the beginning of March 2018.